130MW Solar Farm

Tailem Bend Solar Farm is a 100MW solar photovoltaic generation station that feeds to the National Grid via the ElectraNet’s Transmission system. Over 350,000 solar panels feed into Inverter Stations with step up power transformers, interconnected via Ring Main Units (RMUs) across the solar farm reticulation system. The reticulation system feeds into 6 high voltage feeders across two Switchboards before feeding into the ElectraNet transmission substation at Tailem Bend.

  • Owner: Biosar Australia
  • Location: Nevertire, NSW
  • Scope: 22kV & 132kV Testing and Commissioning

SERVICES PROVIDED

Integral Power® was engaged by Davis Contracting to provide High Voltage Testing and Commissioning of the entire AC network assets including:

  • Primary Testing of High Voltage Switchboards
  • Primary Testing of 2 x 22kV High Voltage Switchboards
  • Primary & Secondary Injection Testing of the Solar Farm Protection Schemes
  • Off Frequency Current Injection Testing of the 22kV & 132kV Earth Grids
  • Step and Touch Potential Validation at the 22kV and 132kV Substations
  • Site Acceptance Testing of 54 x 2MVA, 22/0.6kV Power Transformers
  • Site Acceptance Testing of 10 x 22kV RMUs & Associated Protection Schemes
  • Site Acceptance Testing of 150MVA, 132kV NVS Transformer
  • Primary Testing of 132kV Disconnectors and Earth Switches
  • Detailed Functional and Wiring Checks
  • SCADA Integration Testing
  • High Voltage Switching and Back Energisation Services