Crookwell II Wind Farm is a 95MW generating station that feeds the 330kV Transmission system operated by TransGrid. 28 x 3.4MW GE wind turbine generators feed the 33kV Wind Farm reticulation systems that terminate at 5 x 33kV incomers on a single High Voltage Switchboards before feeding into TransGrid’s 330kV, 100MVA Power Transformer at Crookwell substation.
Integral Power® was engaged by GPG to provide High Voltage Testing and Commissioning of the entire Balance of Plant (BoP) assets including: